Plasma technology R & D background
2839等离子体法是美国在 20 世纪 90 年代开始研发用以处理危险废物的新技术。用于废弃物处理的等离子体是一种惰性气体经过电离形成的气体云, 通常称为物质的第 4 种状态。等离子体体系中含大量正负带电粒子和中性粒子组成。在等离子体系统中, 通入电流使惰性气体, 通过...
查看全文全站搜索
Greenmax's business service process
Our experience and technical expertise ensure that all our customers can obtain industry-leading support and advice in the process of continuous service and support from order placement to installation and commissioning. We provide a simple, step-by-step but comprehensive process, which is flexible enough to be customized according to the specific needs of customers.
Step 1: Evaluate customers
We provide customers with suggestions on how to apply the plasma system to their processes, as well as the types of plasma equipment suitable for their needs.
Step 2: Raw material analysis
In order to technically evaluate the applicability of plasma treatment raw materials, we provide support in reviewing chemical analysis (provided by the customer) before advancing the plasma project to the next stage
Step 3: Feasibility study
我们能够提供全面的可行性研究报告,以满足客户的个性化要求,从桌面研究到现场调查和物理测试。
桌面研究
We can provide a complete set of research reports, including chemical analysis of raw materials and products, leachate test and various microstructure and material properties test. We can also use the software package to carry out thermodynamic modeling of customers' raw materials. Detailed 3D CAD drawings can also be provided when viewing the existing process and equipment installation in the new plant.
Financial modeling
我们的技术能够根据当地条件进行扩展和配置,我们与客户合作开发定制的商业模式,详细说明收入,运营支出,资本支出和投资回报,符合客户自己的要求。
试验(工厂运行)。我们能够在我们的等离子试验设施中为客户提供原料的现场测试,这使客户能够亲眼目睹等离子体在行动,以及对过程,排放和残留物的完全可见性。所有试验数据都以详细、全面的技术报告形式提供。
Step 4: Environmental compliance
We understand the importance of complying with regulations during operation and support their understanding of the impact of plasma technology and its surrounding environment.
Step 5: Field visit
During the field visit to the proposed facility, we will check the applicability and infrastructure to ensure that the site is ready for the installation phase.
Step 6: Installation
We have a highly skilled on-site service team, which can supervise the installation of plasma equipment by the customer's installation team to ensure that the installation process is managed as skillfully as possible.
Step 7: Commissioning and training
During the commissioning phase, we ensure that each operating component of the plant is inspected and tested, and that its customers have received the correct training to provide them with the expertise required to operate the new plasma facility.
Step 8: Continuous service and support
We provide customers with comprehensive and continuous remote support, whether ordering spare parts or equipment maintenance support, to solve any needs as quickly and efficiently as possible. We also understand changes in factory demand to ensure continued customer value.
等离子体法是美国在 20 世纪 90 年代开始研发用以处理危险废物的新技术。用于废弃物处理的等离子体是一种惰性气体经过电离形成的气体云, 通常称为物质的第 4 种状态。等离子体体系中含大量正负带电粒子和中性粒子组成。在等离子体系统中, 通入电流使惰性气体, 通过...
查看全文医疗废物是指医疗卫生机构在医疗、预防、保健以及其他相关活动中产生的具有直接或者间接感染性、毒性以及其它危害性废物。随着医疗卫生事业的发展,医疗废物总量也逐年增长。据国家卫生部数据测算,2017年全年医疗废物总量约为204.69万吨,比2016年增长了6.6%。...
查看全文1.核科学发展现状 核科学技术已广泛应用于工业、农业、医学、军事等多个领域,给人们的生产、生活带来了巨大的便利和利益,同时也对人们的健康、环境的安全和子孙后代的发展产生着重要影响,核安全已成为人们普遍关注的话题,前不久发生的日本福岛核事故又让人们...
查看全文基于环境保护以及资源和能源回收利用的目的,着眼于可持续发展战略,国家对废物处理提出了资源化、无害化和减量化的原则。无害化指处理过的废物对人体健康及周围环境无害;减量化指处理过的废物的体积和数量明显减少以迖到减轻对人类和环境的危害;资源化指对废物适...
查看全文
您好!请登录